Trust and progress

Who builds Zen Park

A project is judged by who answers for it. Every specialty at Zen Park has a named owner — and construction progress is documented on this page as it happens.

Architecture & project direction
Construction
Interior design
Structural engineering
MEP engineering
Passive-architecture consulting
Banca Mifel · Fideicomiso F8166/2024Trustee
Operator
Sales · master broker

Documentation progress

Status of the project's main permits and filings.

  • Environmental Impact Statement (MIA)Authorized and in force
  • Land-use permitObtained (Neighborhood Mixed-Use)
  • Cadastral certificateIn process (paid, pending issuance)
  • Merger of Lots 1 and 4Registered in the Public Registry
  • Soil mechanics studyComplete
  • Construction license V2 (enables vertical works)In process

On-site progress

February 2026
  • Access road to Av. Chac Mool opened
  • Full clearing and preparation of the site
  • Project signage installed
Access road opened to Av. Chac Mool — 650 m in parallel (wildlife crossing preserved)

Access road opened to Av. Chac Mool — 650 m in parallel (wildlife crossing preserved)

Road opening toward the avenue
Road opening toward the avenue
Lot cleared and prepared
Lot cleared and prepared